Main Panel Upgrade for EV Charging (DFW)

125A→200A upgrades, permit & inspection support. See if you can avoid an upgrade with load management.

Electrical Panel Upgrades for EV Charging

Not every home needs a panel upgrade for EV charging, but when you do, our TECL-licensed electricians handle the entire process with transparent pricing and proper permitting.

When Do You Need a Panel Upgrade?

Most homes built before 1990 have 100-amp or 125-amp panels that may need upgrading for EV charging:

  • 100-amp panels - Usually need upgrade for any Level 2 charging
  • 125-amp panels - May need upgrade depending on existing load
  • 150-amp panels - Often sufficient with load management
  • 200-amp panels - Typically ready for EV charging

Can You Avoid an Upgrade?

Sometimes! We explore alternatives first:

  • Load management devices - Smart splitters that share capacity
  • Tesla Wall Connector with power sharing - Automatically adjusts charging speed
  • Lower-amperage charging - 30-amp instead of 60-amp installation

What’s Included in Panel Upgrade

Our comprehensive panel upgrade includes:

  • New 200-amp main panel with modern breaker spaces
  • Service entrance upgrade if your current service is inadequate
  • All permits and inspections coordinated with local authorities
  • Professional circuit relocation from old panel to new
  • Load calculation to ensure adequate capacity

The Upgrade Process

  1. Assessment - We evaluate your current panel and electrical needs
  2. Permitting - Handle all required permits with local authorities
  3. Utility coordination - Schedule any required utility work
  4. Installation - Professional upgrade with minimal downtime
  5. Inspection - Final inspection and approval

When Additional Costs Apply

Your quote may increase if you need:

  • Utility service upgrade - If your home’s service entrance needs upgrading
  • Meter base replacement - Required for some older installations
  • Mast replacement - If your service mast needs updating

Alternative Solutions

Before recommending a full upgrade, we’ll explore:

Load Management Options:

  • Smart electrical panels with load sharing
  • EV chargers with automatic power adjustment
  • Time-of-use charging to avoid peak loads

Lower-Cost Alternatives:

  • 30-amp charging circuits instead of 60-amp
  • Shared circuits with automatic switching
  • Portable charging solutions

Service Areas

Panel upgrade services available throughout:

FAQ

Can I avoid an upgrade? Maybe! We’ll assess load management options and lower-amperage solutions first.

How long does an upgrade take? Typically 6-8 hours, but your power will only be off for 2-4 hours during the actual panel swap.

Do I need permits? Yes, and we handle all permitting and inspection coordination.

Get Your Panel Assessment

Not sure if you need an upgrade? Our photo-based assessment will tell you exactly what’s required.

Get My Panel Assessment

Service Details

Price Range: $2500-4500
Install Time: 6-8 hours

What's Included

  • New 200-amp electrical panel installation
  • Service entrance upgrade if required
  • All necessary permits and inspections
  • Circuit relocation and labeling
  • Load calculation and planning

When Pricing Changes

  • Utility service upgrade required
  • Complex circuit relocation
  • Mast or meter base replacement needed

Ready to get started?

Get your instant price with 4 photos

Get Quote

Related Services

Level 2 EV Charger Installation (DFW)

Transparent pricing and fast scheduling for Level 2 EV charger installs across Dallas–Fort Worth.

Tesla Wall Connector Installation (DFW)

Install your Tesla Wall Connector with TECL‑licensed electricians. Photo‑based quotes and price‑lock.

📞 Call Now