Main Panel Upgrade for EV Charging (DFW)
125A→200A upgrades, permit & inspection support. See if you can avoid an upgrade with load management.
Electrical Panel Upgrades for EV Charging
Not every home needs a panel upgrade for EV charging, but when you do, our TECL-licensed electricians handle the entire process with transparent pricing and proper permitting.
When Do You Need a Panel Upgrade?
Most homes built before 1990 have 100-amp or 125-amp panels that may need upgrading for EV charging:
- 100-amp panels - Usually need upgrade for any Level 2 charging
- 125-amp panels - May need upgrade depending on existing load
- 150-amp panels - Often sufficient with load management
- 200-amp panels - Typically ready for EV charging
Can You Avoid an Upgrade?
Sometimes! We explore alternatives first:
- Load management devices - Smart splitters that share capacity
- Tesla Wall Connector with power sharing - Automatically adjusts charging speed
- Lower-amperage charging - 30-amp instead of 60-amp installation
What’s Included in Panel Upgrade
Our comprehensive panel upgrade includes:
- New 200-amp main panel with modern breaker spaces
- Service entrance upgrade if your current service is inadequate
- All permits and inspections coordinated with local authorities
- Professional circuit relocation from old panel to new
- Load calculation to ensure adequate capacity
The Upgrade Process
- Assessment - We evaluate your current panel and electrical needs
- Permitting - Handle all required permits with local authorities
- Utility coordination - Schedule any required utility work
- Installation - Professional upgrade with minimal downtime
- Inspection - Final inspection and approval
When Additional Costs Apply
Your quote may increase if you need:
- Utility service upgrade - If your home’s service entrance needs upgrading
- Meter base replacement - Required for some older installations
- Mast replacement - If your service mast needs updating
Alternative Solutions
Before recommending a full upgrade, we’ll explore:
Load Management Options:
- Smart electrical panels with load sharing
- EV chargers with automatic power adjustment
- Time-of-use charging to avoid peak loads
Lower-Cost Alternatives:
- 30-amp charging circuits instead of 60-amp
- Shared circuits with automatic switching
- Portable charging solutions
Service Areas
Panel upgrade services available throughout:
FAQ
Can I avoid an upgrade? Maybe! We’ll assess load management options and lower-amperage solutions first.
How long does an upgrade take? Typically 6-8 hours, but your power will only be off for 2-4 hours during the actual panel swap.
Do I need permits? Yes, and we handle all permitting and inspection coordination.
Get Your Panel Assessment
Not sure if you need an upgrade? Our photo-based assessment will tell you exactly what’s required.
Service Details
What's Included
- ✓ New 200-amp electrical panel installation
- ✓ Service entrance upgrade if required
- ✓ All necessary permits and inspections
- ✓ Circuit relocation and labeling
- ✓ Load calculation and planning
When Pricing Changes
- ⚠ Utility service upgrade required
- ⚠ Complex circuit relocation
- ⚠ Mast or meter base replacement needed
Related Services
Level 2 EV Charger Installation (DFW)
Transparent pricing and fast scheduling for Level 2 EV charger installs across Dallas–Fort Worth.
Tesla Wall Connector Installation (DFW)
Install your Tesla Wall Connector with TECL‑licensed electricians. Photo‑based quotes and price‑lock.